Qingdao Yingchun Machinery Co., ltd.

Qingdao Yingchun Machinery co,ltd

National free consultation hotline

0532-87526167

1. The bottom of cone funnel consists of ring beam and bucket wall.
2. The bucket wall can be composed of the trapezoidal plates which are divided into sections. The length of each plate at the top of the funnel shall be 1.0m.
3. The dipper should be designed to weld the whole structure. The diameter of the upper mouth should not be greater than 2.0mm and the lower port size should meet the technological requirements.
4. The inner surface should be smooth after assembly, and the storage of grain shall not be kept.
5. When the material or the flat bottom of the warehouse is adopted, the bottom of the warehouse shall be designed according to the process requirements.

Return to the top